RESOURCES

photo by ​Amber O. Haller Photography

RESOURCES


MOST RECENT DOCUMENTS

Wastewater Revenue & Expense Narrative
Details regarding amounts spent and received as of 2/14/22 for the project

Waitsfield/Warren Wastewater Tour Details
Maps and descriptions of the Waitsfield and Warren community wastewater systems for comparison.

Conceptual map/layout of Community Wastewater System (10/2021) 
Shows the general service area, conceptual design, and step tanks - includes pre-treatment of wastewater. (subject of change and final design)
 
Preliminary Engineering Report Summary (2021)
Preliminary Engineering Report (PER) Summary for a community wastewater system located on the Maple Shade Town Forest property (formerly known as the Jackson Property). PERs are required in order to be eligible for most state and federal funding programs/grants.


Preliminary Engineering Report (2021)
Full Preliminary Engineering Report (PER)


Environmental Information Document (2021)
This Environmental Information Document (EID) accompanies the PER. This document describes the community wastewater system, any potential impacts to environmental or community resources that could be caused by the proposed system, and how those impacts will be avoided or mitigated if the project is constructed. The EID, and ultimately a determination of no significant impact by both Vermont DEC and the U.S. EPA, are required in order for the project to move forward and to remain eligible for state and federal funding programs/grants.
​
OLDER DOCUMENTS

Opinion Letter on Phased Construction (2020)
Engineer opinion on phased construction viability of a community wastewater system located on the Maple Shade Town Forest property.

Equivalent User & Financing Scenario (2019)
A collection of potential funding scenarios used to determine annual system and maintenance and operation expenses for the town and equivalent users (one single family home or 245 gal/day). 

Conceptual Leach Field Design (2019)
Conceptual leach field design for a wastewater system. 

Conceptual Piping Design (2019)
Conceptual piping design within the potential service area for a wastewater system.

State of VT Indirect Discharge Permit-Aquatic Permitting Compliance Preliminary Evaluation (2019)
Conceptual state approval of a wastewater system located on the Maple Shade Town Forest property. This approval was the final piece necessary in order to become eligible for State of Vermont Neighborhood Development Area Designation, which the Town received in 2019.

Capacity & Financing Update (2017)
Updated capacity numbers and estimated costs for a wastewater system.

Wastewater Capacity & Rough Cost Estimate (2015)
Study to determine capacity and cost of a wastewater system.

Town of Westford & White Church Properties – Wastewater Capacity Report (2014)
Study to determine whether the Brick Meeting House, Town Common, Upper Town Common and/or Westford Common Hall property  was a suitable location for a wastewater system.

Town Property (Spiller Lot) – Wastewater Capacity Report (2012)
Study to determine whether the Westford Store & Café Store property (formerly owned by the Town and known as the Spiller property) was a suitable location for a wastewater system.

Town Area Community Wastewater Disposal Alternative Study (2008)
Study to assess the health of existing wastewater systems in the Town Center Area and identify areas that may be a suitable location for a wastewater system in the Town Center.